MNP Brewery Cheltenham

The Brewery

Major redevelopment of Cheltenham town centre brings a of range leisure activities

A truly mixed use development comprising 100,000 sq ft of retail space, a 104-bed hotel, 34 apartments and 20,000 sq ft of offices has been completed in the heart of Cheltenham town centre. MNP were commissioned to provide pre-acquisition and feasibility studies to determine how best to demolish the lengthy High Street frontage and understand the site constraints. Complex civil engineering required us to design a £1m sewer diversion and overcome challenging ground conditions left by the former brewery and grammar school.

Linking to the original Brewery centre, curved concrete frames provide a superb retail boulevard lining through to the High Street. Our work has extended over a 15 year period with multiple retailer fit out schemes including: cinemas, restaurants, bowling alleys, golf centre and a gym.

 

 

Location
Cheltenham
Client
NFU Mutual
Architect / Partner
Roberts Limbrick
MNP Brewery Cheltenham

MNP Brewery Cheltenham

MNP Brewery Cheltenham

MNP Brewery Cheltenham


Pinnacle N10

A mixed-use development regenerating a neglected Muswell Hill site

EdCity

An ambitious new mixed-use development with a focus on education

CCOS South

Complex Urban Regeneration Development on behalf of St Albans and District Council