Construction of a new 2 storey steel frame BMW/Mini dealership, over a single storey concrete basement. Built on the site of the former Spaniards inn adjacent the A3, the site proved a challenging site to service from a drainage point of view with no current connection to foul or surface water sewers. The scheme required the installation of large volume attenuation soakaways under most of the car parking, and the appointment of Thames Water to install a new 1.3KM foul connection.
We worked with Group One Automotive, Taylor Design Architects and Horizon Construction to deliver a structurally efficient steel frame and rationalised basement to offer the best cost efficiencies. The scheme was complicated by the discovery of a 40m deep well under the footprint of the new building, requiring us to employ well remediation specialists to obtain EA approval with modified foundation solutions.
4 storey smart design turns a car showroom into a powerful statement
Major mixed-use development in a green urban setting
A newly built 1800 student secondary school with a three-storey education building and a separate sports hall.
New luxury retirement village situated in the Chilterns Area of Outstanding Natural Beauty