Gascoigne West Phase 1

Gascoigne West Phase 1

Residential Regeneration

Phase 1 of regenerating a residential area with associated amenities in the London Borough of Barking and Dagenham has completed.

The development consists of 201 homes with communal courtyards, an integrated recreational area, and podium gardens.  60% of these homes are affordable housing.  The development comprises of 3 blocks from 3 storey townhouses up to 13 storey apartment buildings. The frames are designed to minimise the carbon footprint as much as possible.

Sustainable civil engineering has been utilised across the site by a combination of green roofs, submerged planting, permeable paving and below ground attenuation to store rainwater, reducing run off to surrounding areas. All of these have been based on future climate change requirements.

We commenced work in the Autumn of 2019 and Phase 1 completed in 2022.

Main image © Paul Riddle

Location
Barking
Client
Be First London
Architect / Partner
White Arkitekter, Wates Group and TP Bennett
Gascoigne West Phase 1

© Paul Riddle

GWP1 development

During Construction


Audley Wycliffe Park

New luxury retirement village situated in the Chilterns Area of Outstanding Natural Beauty

Watling Academy

A newly built 1800 student secondary school with a three-storey education building and a separate sports hall.

Botanical Place, West Byfleet

Two acre Urban Retirement Development providing 199 high quality homes