The store opened in July 2022 and spans 17,000 sq ft of retail space across two floors.
MNP designed the staircase which seamlessly disappears into the full height digital wall. This project pushed the boundaries structurally with what is achievable in an already constructed mall with full height (8m tall) glazing, lowering part of the mezzanine and providing a plant gantry over the upper level, all without strengthening the existing structure and whilst saving 40 tonnes of carbon.
© Image copyright: Tom Morgan @ tdm.space
Structural inspection at retail site
Conversion and vertical extension of an office building in the Grosvenor Gardens Conservation Area
A mixed-use development regenerating a neglected Muswell Hill site